Skip to content

Tea, South Dakota

Decks built for Tea backyards and South Dakota winters

Licensed, insured, owner-led decks from a Harrisburg contractor rated 5.0 across 19 Google reviews.

  • 5.0 · 19 Google reviews
  • Licensed & insured
  • BBB rating A

A lot of Tea homes are newer builds in subdivisions that went up fast as the town grew, and the deck that came with the house is often the smallest thing the builder could attach: a landing and a few steps off the patio door. If you're looking at a bare backyard, or a builder-grade deck that already feels undersized, you're deciding between adding on, replacing, or starting from scratch. In older parts of town the question is usually different: the frame may be fine while the boards and railing have given up.

That is the good version of this problem. A sound frame means the expensive part is already in the ground and the work moves to surface and rail — which is also the point where composite becomes worth pricing, because the structure underneath is what has to carry it.

Get an estimate

Tell us what you're building.

Two required fields. Jace follows up directly to set a walkthrough — or call or text (605) 679-5223.

Rather not wait for a callback?

Pick a time for your estimate

By submitting, you agree we may call, text or email you about your project — no marketing lists, no spam; it's Jace who follows up. Msg & data rates may apply. Reply STOP to a text, or use the unsubscribe link in any email, to opt out. Privacy

Composite or wood in a freeze-thaw climate

Wood costs less up front and can be sanded and refinished, but South Dakota's freeze-thaw cycling works on it every year: boards check, fasteners back out, and a finish that isn't maintained lets water into the end grain. Composite costs more at install and never needs stain, but it moves with temperature swings, so it has to be gapped and fastened correctly or you'll see it in the seams by February. Either way the frame underneath is treated lumber, and that's where a deck actually succeeds or fails. We'll walk you through both options against your budget at the walkthrough.

Repair, replace, or extend: what the frame decides

We start under the deck, not on top of it. If the ledger connection, posts, and joists are sound, new decking and railing on the existing frame is a legitimate repair and we'll tell you so. If the footings were poured shallow and frost heave has been racking the frame, new boards are money spent on a structure that's still moving, and replacement is the honest answer. On a newer Tea home the frame is usually the sound part, and the conversation is more often about going bigger than tearing out. Every deck we build starts with footings below the frost line.

Composite and wood deck builds
Porches and patios
Concrete flatwork and sidewalks
Deck and railing repairs
Basement finishing
Drafting, plans, and financing on qualifying jobs
Elevated cedar deck with a lattice-top pergola and black balusters, built off the back of a ranch home

Recent work

Elevated cedar deck with a lattice-top pergola, black metal balusters, and a stair run down to the patio.

Photographs of Hols & Co projects

Cedar deck and pergola from the side, showing the stair run to grade and posts set in a rock bed
The same build from the side — posts set on footings in a rock bed, with a full-width stair run to grade.
Deck surface under a cedar pergola, looking out over the railing to a fenced back yard
Deck boards and railing under the pergola, with the rafters throwing shade across the surface.
Elevated deck frame on 6x6 posts with temporary bracing, a hot tub already set on the framing, and a Tyvek-wrapped wall behind
Mid-build on an elevated deck: the frame up on 6x6 posts and poured piers, temporary bracing still on, hot tub set in place before the decking goes down.
New pressure-treated deck boards and black-baluster railing at a corner stair transition, ladders and tools still in the yard below
Fresh pressure-treated decking and railing where the main deck steps down to the stair landing — shot before cleanup, ladders still in the yard.
Elevated pressure-treated deck with black metal balusters and a full stair run to grade on the back of a split-level home
Elevated deck on a split-level home: new framing and rail with black metal balusters, and a full stair run down to grade.

In their words

Nineteen reviews. Every one of them five stars.

Read all 19 on Google
Highly recommend Hols & Co. if you are looking for someone to build your deck. The whole team was excellent to work with. They were professional, respectful and communicative. They were very efficient when they were on site and kept out property clean while they worked. Solid craftmanship and the finished product is exactly what we were envisioning. We would definitely hire this crew again for future projects.
Carrie Janssen C.· 2 weeks agoDeck build
Our new cedar deck, built by Hols and Co, is fantastic! We were consistently impressed by their professionalism and great communication from start to finish. They listened to our needs, offered helpful suggestions, and kept us updated regularly. The quality of the construction is excellent. We highly recommend them to anyone wanting a beautiful, well-built deck.
Leonard· a year agoCedar deck
The team was great. The quality of work is fantastic. I saw their ad on social media and took a chance and contacted them. So glad I did! Wanted my back deck replaced and they did a beautiful job. Even worked Saturday because the wood for the deck didn't show up on time. Looking forward to having them back for my next project!
Laura· 2 weeks agoDeck replacement

FAQ

Fair questions, straight answers.

Do I need a permit to build a deck in Tea?

Attached decks generally require a building permit. Inside Tea city limits the permit runs through the city; outside them, it's typically a Lincoln County matter. We handle the permitting either way as part of the job, and the scope is set in a written estimate after an in-person walkthrough.

The deck on my newer Tea house is small. Can you extend it instead of replacing it?

Often, yes. It depends on what's under it: if the frame is sound and the footings sit below the frost line, we can tie new framing into it and reboard the whole surface so it reads as one deck. If the original was set on shallow piers, an addition just loads a structure that heaves every spring, and we'd recommend rebuilding the frame. We check all of that at the walkthrough before writing the estimate.

Ready when you are.

Jace walks the site, writes the quote, and runs the build. Free written estimate, no obligation.

Call nowGet an estimate